Show blog navigation
January 26
Mark van Drieberge
managing partner

Hypsos breaks records at Olympics

For the fifth time in a row Hypsos is active at the Olympic Games. Of cours our work is finished long before the official opening ceremony of the Winter Olympic Games which takes place on Friday 9 February.

After a preparation period of almost two years, Hypsos has been working continuously from early January on at locations around the Winter Games in Korea to build-up as much as four hospitality area’s where the organisation and sponsors can receive important relationships and together enjoy top-class sport.

One of those projects is the Holland Heineken House

A fine example of an impressive project built by Hypsos during the Olympics is the exhibition The Olympic Journey in London in 2012, built in the Royal Opera House in London.  Read more